Job description:

It was huge job  that we did on winter, it takes about 2 months and there was too many changing. there was some un level area the we level them. we change all floors and we used some great tile idea on the foyer that designed by @alfa design. also we removed some interior wall from basement to make open concept area for the party room with small and cozy kitchen.

you can see all the steps of our job in this project as below:

2500 Sf. on New-market, ON

*Change the carpet to hardwood
*Full painting
*Install 85 LED pot light
*Additional Kitchen and island
*Install new counter top
*Wood work on Fire place
*New fire place
*Install crown molding
*Install Baseboard and shoe mold
*New stairs and handrail
*building new Deck
and more….